Estimated number of other individuals expected to complete ToT secondary training by specified type
RequiredoutputATR-6
Planning figure, no collection needed
A planned or proposed figure, not a reported one.
a. (Specified other type 1): b. (Specified other type 2): xc.. (Specified other type x):
- Instrument
- CORT
- Reporting
- annual
- Target
- Applicant proposes the target